
Jaipur Metro Line 2 is planned to feature a direct underground link to all three terminals of the airport, enhancing commuter connectivity. Following consultations between airport authorities and Jaipur Metro Rail Corporation (JMRC), passengers will have access to dedicated tunnels and shuttle services connecting the Airport Metro Station to the terminals. The new terminal is expected to be operational by the time Line 2 opens, with JMRC constructing tunnels, walkways, and elevators. The Airport Station will have two entry/exit points, one directly linked to terminals and another for local commuters.
Select a news story to see related coverage from other media outlets.