NTPC to Conduct Feasibility Studies for Nuclear Projects in More Indian States
State-owned NTPC plans to expand its nuclear power capacity by conducting feasibility studies in additional states, including Uttar Pradesh, aiming for 30 GW by 2047 to support India's 100 GW nuclear target. Feasibility studies have identified potential sites in Bihar, Madhya Pradesh, and Odisha. Projects are expected to have an average capacity of 1,400 MW with two 700 MW units. The process involves technical reviews by the Department of Atomic Energy and the Atomic Energy Commission, with estimated investments ranging from Rs 15,000-20,000 crore per GW.
First-hand measurement across 4 sources
We measured how 4 outlets covered this story. No outlet gave this story a measurable political slant — there is no left–right reading to report. Overall sentiment is positive (61/100). Lens Score 50/100.
Outlets measured: moneycontrol, economictimes, businessstandard, news18. See how each one headlined and framed the same story in the source comparison below.
AI Analysis
Sentiment was consistent across outlets (52–70/100), indicating broadly factual reporting rather than editorialising.
Coverage timeline
news18 broke this story on 18 Oct, 06:02 am. Other outlets followed.
