Uttarakhand Government Awards Thermal Power Project to Adani Amid Congress Allegations
The Uttarakhand government awarded a 1,320 MW thermal power project to Adani Power through a tariff-based competitive bidding process after a joint venture with state-owned UJVNL and THDC India was not feasible, as THDC is not authorized for thermal generation. The Congress party alleges that the BJP government altered tender conditions to favor Adani, accusing it of sidelining public sector projects. The government denies these claims, stating only minor, approved changes were made and the process was competitive and transparent.
First-hand measurement across 3 sources
We measured how 3 outlets covered this story. Coverage leans balanced overall (Left 19%, Centre 51%, Right 30%). Overall sentiment is neutral (51/100). Lens Score 62/100.
Outlets measured: english, news18, thehindu. See how each one headlined and framed the same story in the source comparison below.
AI Analysis
Outlets split on this story: 1 leaned left, 1 stayed centre, and 1 leaned right — see how each framed it below.
Sentiment ranged widely across outlets — from 28/100 to 62/100 — a sign the coverage itself was contested, not just reported.
Coverage timeline
thehindu broke this story on 17 Sept, 11:51 am. Other outlets followed.
