
The Brihanmumbai Municipal Corporation (BMC) will engage experts from IIT Bombay to independently verify the design of the proposed 530-metre railway overbridge in Bhandup, focusing on a sharp turn in its alignment. Construction began in 2024 with 30% completed, aiming for completion by January 31, 2027. The bridge will connect Veer Savarkar Road and Lal Bahadur Shastri Road, expected to reduce travel time and ease congestion on nearby routes. A traffic simulation study will also be conducted to ensure safe vehicle movement.
Select a news story to see related coverage from other media outlets.