Skip to content
Get the Balanced News app for a better experience!
The Balanced News Logo
Analytics
The Balanced News Logo

Stay Balanced, Stay Informed

Menu
  • Browse News
  • Underreported Stories
  • Curated Feeds
  • Insights
  • Analytics
  • Our Writers
  • About Us
  • Download App
Learn
  • How It Works
  • Bias Detection
  • Lens Score
  • Source Bias Checker
  • Accountability
  • Custom Feeds
Newsroom
  • Writers & Analysts
  • About TBN
  • Editorial Standards
  • Corrections Policy
  • Our Partners
  • Insights
Socials
  • Youtube
  • Instagram
  • X
  • Facebook
News Categories
  • Trending
  • Politics
  • Sports
  • Business
  • Tech
  • Entertainment
  • Health
  • Science
  • Crime
  • Lifestyle
  • National
  • International
  • Good News
  • Crypto

Get Our App

Available for iOS and Android


LensFeedsInsightsAnalyticsTrendingGood NewsSportsPoliticsBusinessCrimeTechEntertainmentHealthNationalInternational

© 2026 The Balanced News. All rights reserved.

About UsEditorial StandardsCorrectionsHelp & SupportPrivacy PolicyTerms & Conditions
Mumbai-Ahmedabad Bullet Train to Use Advanced Track Technology for Smooth High-Speed Travel

Categories

Categories

Related Coverage

Select a news story to see related coverage from other media outlets.

Related Coverage

Select a news story to see related coverage from other media outlets.

  1. Home
  2. /
  3. Technology

Mumbai-Ahmedabad Bullet Train to Use Advanced Track Technology for Smooth High-Speed Travel

Analysed 25 Sept 2026·13 sources analysed·India·Technology
Mumbai-Ahmedabad Bullet Train to Use Advanced Track Technology for Smooth High-Speed TravelPreviousNext

The Mumbai-Ahmedabad High-Speed Rail Corridor, designed for speeds up to 320 kmph, will feature advanced track-changing technology including movable or swing-nose crossings and canted turnouts. These innovations create a continuous rail surface, reducing jolts, vibrations, and wear when trains switch tracks at high speeds. This marks the first use of such technology on the Indian railway network, aiming to ensure safe, smooth, and reliable operations along the 508-kilometre corridor connecting Mumbai and Ahmedabad.

Sentiment
64%
TBN's observations

First-hand measurement across 11 sources

We measured how 11 outlets covered this story. No outlet gave this story a measurable political slant — there is no left–right reading to report. Overall sentiment is positive (64/100). Lens Score 43/100.

Outlets measured: news18, mint, news18, moneycontrol, ndtv, swarajyamag, freepressjournal, economictimes, and 3 more. See how each one headlined and framed the same story in the source comparison below.

AI analysis of 11 sources · Published under editorial oversight by The Balanced News
Analysed 25 Sept 2026· How this analysis is produced· Editorial standards· Corrections

AI Analysis

Sentiment — Positive (64/100)

Sentiment was consistent across outlets (55–75/100), indicating broadly factual reporting rather than editorialising.

Coverage timeline

economictimes broke this story on 21 Sept, 06:35 pm. Other outlets followed.

21 Sept, 06:35 pm11 sources · 43 h23 Sept, 01:38 pm
AI analysis by the TBN Bias Engine · beat methodology byAshwin Alsi· Technology Editor· editorial standards byOjas Kale
← Previous
NCW Chairperson: AI and Law Must Evolve Together for Citizen Protection
Next →
Meta Launches Ray-Ban Meta Gen 3 Smart Glasses in India with Upgrades
  1. 1
    economictimes21 Sept, 06:35 pm
    India's plan to surpass Japan's E10: B35 bullet trains to target 350 kmph by 2030 as first B28 trains prepare to run at 249 kmph from 2027
  2. 2
    indianexpress22 Sept, 07:01 am
    How will Mumbai-Ahmedabad bullet train change tracks at high speed? NHSRCL explains
  3. 3
    news1822 Sept, 07:02 am
    Mumbai-Ahmedabad bullet train corridor gets high-speed movable crossings
  4. 4
    economictimes22 Sept, 11:35 am
    India's new plan for fastest bullet train: By 2030, India eyes 350 kmph B35 after B28 prototypes begin trials in 2027
  5. 5
    freepressjournal22 Sept, 05:26 pm
    Mumbai-Ahmedabad Bullet Train Corridor To Get Movable Crossings For 320 Kmph Operations, Improving Safety And Reliability
  6. 6
    swarajyamag23 Sept, 03:15 am
    India's First Bullet Train Corridor Gets Movable Crossings Designed For Speeds Up To 320 Kmph
  7. 7
    ndtv23 Sept, 06:15 am
    How India's 320 Kmph Bullet Train Will Change Tracks Without A Jolt. Technology Explained
  8. 8
    moneycontrol23 Sept, 06:54 am
    How Mumbai-Ahmedabad bullet train will change tracks at 320 kmph without slowing down
  9. 9
    news1823 Sept, 09:15 am
    Mumbai-Ahmedabad Bullet Train: The New Technology That Will Let Trains Switch Tracks At 320 Kmph
  10. 10
    mint23 Sept, 11:57 am
    Mumbai-Ahmedabad bullet train: How canted turnouts help trains switch tracks at 320 kmph Mint
  11. 11
    news1823 Sept, 01:38 pm
    Mumbai-Ahmedabad Bullet Train, Moving At 320 Kmph, Will Change Tracks Without A Jolt: Here's How

Who's involved

Institutions and figures named across source coverage.

Government
Mumbai-Ahmedabad High-Speed Rail ProjectMinistry of RailwaysNational High-Speed Rail Corporation Limited
Corporate
Bharat Earth Movers Limited

Story context

Category
Tech
Location
India
Sources analysed
13
Last analysed
25 Sept 2026
Key entities
Railroad switchRail profileIndian RailwaysRailway trackInterlockingHigh-speed railIndiaBullet Train (film)National High Speed Rail Corporation LimitedPoint machineBullet (interurban)Trains (magazine)