Gurugram Advances Waste-to-Energy Project at Kasan After Decade-Long Delay
The Municipal Corporation of Gurugram (MCG) is advancing its decade-delayed waste-to-energy project at Kasan village, Manesar, by planning to sign a Memorandum of Understanding with a government-owned company for implementation. The facility aims to process fresh municipal solid waste from Gurugram and Manesar, reducing daily waste sent to the Bandhwari landfill, which holds about 16-17 lakh metric tonnes of legacy waste. Technical details and tendering will follow once the agreement is finalized, with biomining ongoing at the landfill site.
First-hand measurement across 2 sources
We measured how 2 outlets covered this story. No outlet gave this story a measurable political slant — there is no left–right reading to report. Overall sentiment is neutral (52/100). Lens Score 44/100.
Outlets measured: swarajyamag, hindustantimes. See how each one headlined and framed the same story in the source comparison below.
AI Analysis
Sentiment was consistent across outlets (52–52/100), indicating broadly factual reporting rather than editorialising.
Coverage timeline
hindustantimes broke this story on 13 Aug, 03:52 am. Other outlets followed.
- 1
